Al-Brumbul Wastewater Treatment Plant: Handover inspection over the treatment basins

Giza · Wastewater treatment

Al-Brumbul Wastewater Treatment Plant

Al-Brumbul, Giza · 2025

Capacity
15,000 m³/day
Process
ASBR (sequencing batch reactor)
Location
Al-Brumbul, Giza
Client
Construction Authority for Potable Water & Wastewater (CAPWW)
Consultant
Dr. Medhat Saleh Consultant (Seeco)
Scope
Design and build, civil + electromechanical
Status
Handed over April 2025

Overview

Design and build of a 15,000 m³/day wastewater treatment plant at Al-Brumbul in Giza Governorate, using ASBR technology.

Beltagin delivered the complete civil works and every electromechanical system, from the inlet screens and grit removal to aeration, sludge handling, chlorination and the plant's power supply. The plant was handed over in April 2025.

Civil works

  • Excavation and backfilling
  • Reinforced concrete works
  • Brickwork and steel works
  • Insulation, plastering and paint works
  • Paving and aluminium works
  • Sanitary works

Electromechanical works

  • Inlet building: screens, scraper, skimmer and vortex grit removal
  • Excess and thickened sludge pumps, cranes and decanters
  • Aeration systems and air blowers for the reactor tanks
  • Air blower system for the grit removal tank
  • Chlorination system
  • Low- and medium-voltage panels
  • 1,500 kVA transformer and 1,650 kVA diesel generator
  • Fire alarm system
Al-Brumbul plant handed over

Milestone · April 2025

Al-Brumbul plant handed over

The 15,000 m³/day ASBR treatment plant in Giza is handed over, with a visit from the Deputy Minister of Housing.