Giza · Wastewater treatment
Al-Brumbul Wastewater Treatment Plant
Al-Brumbul, Giza · 2025
- Capacity
- 15,000 m³/day
- Process
- ASBR (sequencing batch reactor)
- Location
- Al-Brumbul, Giza
- Client
- Construction Authority for Potable Water & Wastewater (CAPWW)
- Consultant
- Dr. Medhat Saleh Consultant (Seeco)
- Scope
- Design and build, civil + electromechanical
- Status
- Handed over April 2025
Overview
Design and build of a 15,000 m³/day wastewater treatment plant at Al-Brumbul in Giza Governorate, using ASBR technology.
Beltagin delivered the complete civil works and every electromechanical system, from the inlet screens and grit removal to aeration, sludge handling, chlorination and the plant's power supply. The plant was handed over in April 2025.
Civil works
- Excavation and backfilling
- Reinforced concrete works
- Brickwork and steel works
- Insulation, plastering and paint works
- Paving and aluminium works
- Sanitary works
Electromechanical works
- Inlet building: screens, scraper, skimmer and vortex grit removal
- Excess and thickened sludge pumps, cranes and decanters
- Aeration systems and air blowers for the reactor tanks
- Air blower system for the grit removal tank
- Chlorination system
- Low- and medium-voltage panels
- 1,500 kVA transformer and 1,650 kVA diesel generator
- Fire alarm system

Milestone · April 2025
Al-Brumbul plant handed over
The 15,000 m³/day ASBR treatment plant in Giza is handed over, with a visit from the Deputy Minister of Housing.